sabung ayam online sabung ayam online sabung ayam online sabung ayam online sabung ayam online sabung ayam online sabung ayam online

33 kV & 69 kV Cable Jointing & Termination‎

Code : E022 | Electrical and Electronic Engineering
Request In-house Training Proposal
Why Attend This Training Course?
We are fully committed to raising the standards for cable accessory installation including cable joints, terminations and connectors for medium/high voltage cables. A series of jointer training modules are now available to support the training requirements for cable jointers upskilling from LV to MV to HV with tailored courses at 33kV and 69kV voltage levels. The jointer training courses will also explain electric stress and methods of dealing with it. What happens if products are not installed correctly, along with how the MV-HV products are made and how they should be handled.

What Is The Training Course Methodology?
This training methodology illustrates the concepts involved in the above areas through practical consideration of actual real-life problems, as well as explanation of concepts by experts in area using video projectors and computer aided case studies based on practical applications. Participants will solve their system problem, where the trainee’s try to apply the skills learnt with guidance from our specialized experts. ACAD will provide participants a comprehensive assessment on the problems solved using the skills acquired in the training course.

Who Should Attend This Training Course?
This training course is designed for all Engineers and Technicians and Managers who are working in cable laying and for emergency.

What Are The Training Course Objectives?
This course presents installation of joints and terminations for 33 kV and 69 kV cables. The course also provides excellent practice for the engineers and technicians who are working in cable laying and for emergency.

What Is The Training Course Curriculum?
Introduction
  • Cable materials
  • Properties of commomn insulation and sheath materials
  • Power cables
  • Fire characteristic of cables
  • Cable joints
  • Cable tremination 
Cable Jointing 33 and 69 KV
  • Tape joints 33 and 69 KV
  • Prefabricated push – On joints
  • Vulcanized on site
  • Filling with compound
Crimp Connection
  • General
  • Crimp connection is a system technique
  • Crimp connection of 10-1200 mm copper conductors
  • Crimp for aluminum conductors
Splicing Cable
  • Cable jacket and sheath removal
  • Cable metallic shielding removal
  • Cable semi conducting material removal
  • Cable insulation removal
  • Cable paper – Insulation
  • Cable splice connector
 Cable Bonding and Grounding
  • Cable shield bonding
  • Cable fault location
  • Installing taped cable insulation
  • Prefabricated cable splice insulation
  • Place cable splice on rack
  • Video tape presentation for joints and terminations
  • Evaluation and discussion
Course Details
Personal Details

Course Schedule

16 - 20 Feb
10:00 AM To 3:00 PM
Cairo, Egypt
$1500
07 - 11 Sep
10:00 AM To 3:00 PM
Cairo, Egypt
$1500

Search in Courses

Register Upcoming Courses